Assessment 3 End of Life Assets Assignment

By March 12, 2018Academic Papers

Assessment 3

Part A – End of Life Assets: Refuse, Reduce, Reuse, Repurpose, and Recycle?

Select a Project of some kind. It can be of any particular nature, Capital Works, Operations, Asset, Activity or Facility. Consider the lifecycle of the

Project.

Examples include;

1.

Building a residential home

2. A mobile phone

3. A car park

4. A Theme Park

You are part of a multidisciplinary team designing a similar Project and your role is to assess what happens to each component of the Project when it has

reached the end of its useful life, both within the life of the Project and when the Project itself has reached its end.

What happens to each component after it is no longer required? Can you Refuse, Reduce, Reuse, Repurpose or Recycle the component? What is

international practice compared to Australia? What impact does your assessment have on the design of the Project? Complete your assessment and then

submit it and explore the issues of waste minimisation in design with your peers on the discussion board.

Use the template provided to consider waste management options for each component of the Project (minimum 25 rows).

(Attached

)

Part B – Greenhouse Gas Estimation Exercise

Your task is to use the Threshold Calculator to assess if your organisation / corporation is likely to have obligations to register and report under the

National Greenhouse and Energy Reporting Act 2007 (NGER Act). The tool is available via the link below.

After completing your calculation, read Section 6 from reference given (Carbon Management Framework for Major Infrastructure Projects, 2009).

(Attached

) Make a recommendation on whether the calculation is sufficient and whether a modified approach should be taken with respect to Section 6

In a separate sheet

of the reference. ( )

As before; complete your assessment and then submit it and explore the issues of carbon accounting with your peers on the discussion board.

1. Threshold Calculator 2016-17 and user guide – to be used for Class Challenge 2 Part B (

http://www.cleanenergyregulator.gov.au/NGER/Forms-and-resources/Calculators

link below

)

2. Carbon Management Framework for Major Infrastructure Projects Required reading for Class Challenge 2 Part B (

attached

)

Submission Guidelines

Due End of Week 4

Marks 10 points each part (20 total)

Format For each: Complete the worksheet and then discuss

Word Count Variable

Marking Guide

Insufficient

Competent

Proficient

(0%) – 0 (0%) Illogical or incomplete attempt

(0%) – 1.5 (15%) Suitable attempt

Comprehensive Completion of Worksheet

1.5 (15%) – 3 (30%) comprehensive attempt

Meaningful Participation in Discussion

(0%) – 0 (0%)
did not engage with other students

(0%) – 2 (20%) minimum 2 posts deliberately engaging with other students in a meaningful way

2 (20%) – 4 (40%)
minimum 4 posts deliberately engaging with other students in a very meaningful way

Engagement with theory

(0%) – 0 (0%) does not engage with theory

(0%) – 1.5 (15%) shows an understanding of the relevant theory

1.5 (15%) – 3 (30%) uses their understanding of relevant theory to contribute meaningfully to the discussion

Logo